TRANSPORTING WARNING: Be sure to slowly operate the boom. If quickly operated, the lever block and/or wire rope may be damaged and/or fly away, possibly causing severe personal injury. Stay away from the machine when operating the boom. 10. Slightly slacken wire rope tension by operating lever blocks (5) and raise the boom to slightly lower the track frame. Do not slacken wire rope tension excessively. Also, take care not to lower the track frame excessively. If ex- cessively slackened or lowered, side frame (3) will retract making re-tightening (by hand) of bolts difficult. 5 11. After slightly lowering track frame (2), re-tighten bolts (1) by hand. M166-01-256 12.
Repeat steps 10 and 11 three to four times until the track frame is completely lowered to the ground. 3 13. Slacken the lever blocks. Remove the lever blocks and wire ropes. 14. Tighten bolts (1) with the power boost wrench and torque wrench to specification. Tightening Torque: 2800 N•m (280 kgf•m, 2025 lbf•ft) 2 IMPORTANT: Be sure to apply a film of lubricant to the bolt threads. 1 15. Extend the side frame on the opposite side in the same procedure. M162-06-002 6-24 Model Bolt Size Width across Flats (mm) Torque N•m (kgf•m, lbf•ft) Note ZAXIS850-3, 850LC-3, 870H-3, 870LCH-3 M36-Pitch 3 55 2800 (280, 2025)