MAINTENANCE 2 Change Bucket 1 2 WARNING: When driving the connecting pins in or out, guard against injury from flying pieces of metal or debris; wear goggles or safety glasses, and safety equipment appropriate to the job. 1. Park the machine on a level surface. Lower the bucket to the ground and position it with the flat surface resting on the ground. Be sure the bucket will not roll when the pins are removed. 2 Separation Section Type A (Separate Type O-ring) 2. Remove o-rings (1) after loosing nut (2). Type A M1J1-07-074 Type B (Unit Type O-ring) 2. Slide O-rings (3) out of the way, as shown. 3 O-Ring Shift 3. Remove bucket pins A and B to separate the arm and bucket.
Clean the pins and pin bores. Apply sufficient grease to the pins and pin bores. 4. Align the arm and alternate bucket. Be sure the bucket will not roll. 5. Install bucket pins A and B. 6. Install the locking pins and snap ring on pins A and B. Bucket Boss Type B 7. Adjust bucket linkage clearance for pins A. See the Ad- justing Bucket Linkage procedure on the next page. Link Type A (Separate Type O-ring) Arm B 8. Tighten nut (2) after installing O-rings (1) on the bucket boss A and B. And cut off the bolt extended from the nut. Refer to the check O-rings in bucket of Chapter 7. A Type B (Unit Type O-ring) Bucket 8. Install O-rings (3) on the bucket boss A and B. 9.
Apply grease to pin joints A and B. M104-07-063 10. Start the engine and run at slow idle. Slowly operate the bucket in both directions to check for any interference in bucket movement. Do not operate a machine that has any movement interference. Correct interference prob- lem. 7-82