Komatsu — 4.16.3 PROTECTIVE MEASURES BEFORE STARTING WELD REPAIRS ON THE SUPERSTRUCTURE

MAINTENANCE 4.16 WELD REPAIRS 4.16.3 PROTECTIVE MEASURES BEFORE STARTING WELD REPAIRS ON THE SUPERSTRUCTURE Legend for illustration Z 22590 (1) Battery main switch keys (2) Battery main switches (3) Diesel engine (4) Interface harness connectors located on left engine side near the flywheel housing. (5) Central control and filter carrier (6) Cab base (7) Main switch board "X2" (8) Circuit breakers (9) Programmable logic controller (PLC) (10) Electronic pump control module MC7 (11) Wiring harness connector 1. Remove battery main switch keys (1). 2. Disconnect the 21-pin and 31-pin interface harness connec- tors (4) on the engine. 3. Switch off all circuit breakers (8) on switch board (7). 4.

Disconnect all plugs on the programmable logic controller (9). 5. Remove the wiring harness connector (11) from electronic pump control module MC7 (10). 6. Attach the welding ground directly to the part that is being repaired. Do not allow welding current to go through bearings. Welding current could arc the bearings, resulting in severe damage to the bearing. 7. Observe the prevailing safety and fire prevention regulations. Before any weld repair is started, a survey should be made of the area and all safety considerations satisfied such as fuel tanks, oil lines, electrical cables and synthetic materials.

NOTICE DO NOT carry out weld repairs on engine (3), on the cen- tral control and filter panel (4) and on the cab base (6). Contact your local Komatsu dealer if such repairs are necessary. Be sure to isolate Electronic Components of Special Equipment e.g. Air Conditioning, Generator Set, Pre- heating systems etc. 483