HP — INSTALL STARTERPP218G AND P220G ENGINES

Starter/Starter IMPORTANT: To avoid solenoid overheating, do not leave solenoid activated longer than necessary to measure clearance. 20. Close the switch to activate solenoid which will shift the pinion into cranking position. Measure clearance between the pinion and stop ring. SPECIFICATION Item Nominal Value Pinion-to-Stop Ring 0.5 to 2.0 mm Clearance (0.020 to 0.079 in.) If clearance is not within the nominal value limits, add or remove shims between solenoid and front frame. See Step 15. Adding shims provided with Solenoid Repair Kit, decreases the amount of clearance. M37148 -UN-25JAN90 21. After assembly, perform bench test.

(See “Bench Test Solenoid Drive Starter” in this group.) M98,2060K,71 -19-05NOV85 CTM2 (19APR90) 60-28 16, 18, 20 & 24HP Onan Engines AllTractorManuals.com 130495 INSTALL STARTER—P218G AND P220G ENGINES 1. Install starter. Tighten cap screws (A) to 26 N·m (230 lb-in.). 2. Align flywheel shroud and install cap screws. 3. Install side shroud and cap screws. 4. Install manifold and lift bracket. Tighten cap screw to 11 ± 3 N·m (97 ± 27 lb-in.). 5. Connect spark plug wire. 6. Install engine. (See machine technical manual.) -UN-08JAN90 M46014 M98,2060K,72A -19-02FEB87 60 28