HP — INSTALL CAMSHAFT

Camshaft/Camshaft 21. Apply pipe sealant on cap screw (A) threads. 22. Install clip (B), four cap screws and nut. Tighten cap screws and nut to 12 ± 1 N·m (106 ± 9 lb-in.). 23. Install stator wiring (C) in clip. M36330 -UN-29JAN90 24. For P218G or P220G engine, connect wires leads to ignition coil. Install crankshaft key and magnetic ring. M98,2025K,38 -19-10FEB87 29. Install breaker point wire in breaker point assembly groove. 20. Install breaker point cover and tighten Allen screw. M36299 -UN-29JAN90 CTM2 (19APR90) 25-17 16, 18, 20 & 24HP Onan Engines M98,2025K,40 -19-10FEB85 AllTractorManuals.com 130495 25. Install new gasket (A) on cylinder block. NOTE:

Be careful not to lose the plunger during breaker point assembly installation. 26. Apply clean engine oil on plunger. Remove excess -UN-29JAN90 oil after installation. 27. Apply pipe sealant on Allen screw threads. 28. Install breaker point assembly and fasten with two M36331 Allen screws, if equipped. -UN-29JAN90 M36300 M98,2025K,39 -19-10FEB87 25 17