Komatsu — Slide Number 1

. MAINTENANCE MAINTENANCE PROCEDURE (1) loose, they will 4 - 29 CHECK AND TIGHTEN TRACK SHOE I f the m achine is used with t rack shoe bol break, s o tighten a ny loose b olts immediate Tighteni Triple s hoe, swam p shoe, flat shoe, rubber 1. Firs t tighten to a tightenin g torque of 490 ± 49 Nm (50 ± 5 kgm , 360 ± 36 lbft) then check t hat the nut an d shoe in close co ntact with t he link contact 2. Afte r checking , tighten a f urther 120° ± 1 Road lin Tighten to a tightening torque of 550 ± 60 N m (56 ± 6 kg 405.0 ± 43.4 ibft).

After tig htening, c heck that th e nut and shoe are in close contact with the link contact surface Order for Tighteni ng in the order shown in the diagram on the right. Tighten the bolts in the he right. After tig htening, c heck that th e nut and shoe are in close contact with the link matin g surface.