Komatsu — Slide Number 1

. MAINTENANCE MAINTENANCE PROCEDURE CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT) WARNING carried out. pressure in the control circuit. Even for the work equipment to go down 4 - 73 The a ccumulator is charged wi th high-pressure nitrogen gas, so mistaken operation may cause an explosion, which will lead to seriou s injury or damage. Whe n handling the accumulator, always do as follows. Th e pressure in the hydraul ic circuit cannot be completely removed. When removing the hy draulic equipment, do not stand he direction that the oil s purts out when carrying out the operation. In addition, loosen th e bolts slowly when carrying out operation.

Do not disassemble the acc Do not bring it near flame o Do not make holes in it or w Do not hit it, roll it, or subje Wh en disposing of the acc umulator, the gas must be released. Please contact your Komat su distributor to have this work NOTIC E If the nitrogen gas charge pres sure in the accumulator is low and operations are continued, it w ill become impossible to release the re maining pressure inside the hydraulic circuit if a failure occurs on the machine. FUNCTION OF ACCUMUL The a ccumulator stores th after the engine is stopped, the fo llowing actions are po If t he control lever is ope eq un uipment, it is possibl der its own weight.

Th e pressure in the hyd The a ccumulator is installe on th e right.