. OPERATION TRANSPORTATION UNLOADING 3 - 115 1. Load and unload on firm level ground only. Maintain a safe distance from the edge of 2. Apply the brakes on the blocks (1) under the tires to hold th Set the distance (3) betw een ramps (2) to match the distance between the left and rig (4) the ramps a maximum of 15 If ramps (2) sag apprecia bly under the weight of the machine, put wooden block (5) un der the ramps to support them. 3. Remove the chains and wire ropes fastening the machine. 4. Set the frame lock bar to the FREE position. . 5. Start the engine. Warm the engine up fully 6. Check that the work equ ipment control lever is at t he HOLD position, then set the wo position.
rk equipment lock lever to the FREE the FREE 7. Depress brake pedal (6) and turn parking brake leve r (7 ) to the FREE position to release the parking brake. pressed. of the ramps, then drive the machine Keep brake pedal (6) de 8. Determine the direction