. OPERATION OPERATION BUCKET OPERATION position. Position (b): HOLD 3 - 93 Position (a): TILT When the lever is pulled further from the TILT p osition, the leve r is stopped in this position until the bucket r eaches the preset position of the positioner The buck et is kep t in the s ame position. Position (c): DUMP