Operation—Operating the Machine CAUTION: When the threads of the counterweight-to-mainframe tie bolt (A) disengage from the slotted nut (B), the slotted nut and slotted nut spacer may drop to the ground. Stay clear from under the machine when removing the tie bolts. CAUTION: The counterweight weighs approximately 8210 kg (18,100 lb). Use an adequate lifting device when lifting the counterweight. Clear everyone from the area before removing or installing the counterweight. Specification Counterweight—Weight............................................ 8210 kg (18,100 lb) 23.
To avoid binding, remove the large counterweight-to- mainframe tie bolts (A) by alternately turning each bolt one turn at a time. 24. Remove cap screws (F), plates (G), spacers and shims (E) from each counterweight boss. To avoid binding, alternately loosen left hand and right hand counterweight boss cap screws two or three turns at a time. T8172AD —UN—20FEB94 25. Slowly lower counterweight to the ground until all weight is removed from the linkage and the yokes move freely in their slots. 26. Remove counterweight yoke-to-link pins. 27. Tighten adjusting cap screw jam nut.
A—Tie Bolt (2 used) B—Slotted Nut (2 used) C—Boss Plate (2 used) D—Counterweight E—Shim (as required) F—Cap Screw (4 used) G—Lock Strap (2 used) 28. Raise counterweight cylinder to end of its stroke. 29. Store the yoke-to-link pins by attaching pins to the counterweight lift brackets. 30. Close hydraulic counterweight shut-off valve by turning valve handle clockwise. 32. Install counterweight lift cylinder lower guard. 33. Install lever cover over counterweight pilot valve. 31. Install top cover to the counterweight and two bottom covers to the machine mainframe. 34. Close left rear access door and engine hood. DW90712,0000179 -19-29JUN06-10/10 2-2-15 060313 PN=55