. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE 7. Open drain valve (7) and drain the water. valve (8). radiator is full, start the 4 - 29 6. Remove cover s (4) and (5) at the rear of the machine, pull out drain hose (6), and prepare a container to ca REMARK When adding wate r to the cooling system, keep air bleed valve (8) open. This allows When the air is re the air to escape during the moved and water comes ou filling operation. t, close air bleed 8. engine and run at low idling to raise the tem perature to at least 90°C (194°F), then con 10 minutes. 9. Stop the engin e and open drain valve (3), (7 10. Close drain val 11.
Add coolant thr ough the water filler port up t o the mouth of the port. For details of the C "COOLANT DE NSITY TABLE". 12. To bleed the ai r from the cooling water, start the engine, run for 5 minutes at low idling, minutes at high idling. (When doing this, lea 13. Drain the coo lant inside reserve tank, flu sh the inside of reserve tank , t marks. hen add coolant to between th e FULL and LOW 14. Stop the engin e and tighten the cap. Check the coolant level, and add water