daewoo Solar 140LC-V — Lifting With Sling

10. Shut down engine by turning key to "O" (OFF) position (Figure 7). 11. Remove key from starter switch. HAOC340L Figure 7 12. Make sure to secure the excavator onto the trailer before transporting. Place blocking (1, Figure 8) in front of and behind each track. Use chains or cable tie-downs (2) as required by local transportation laws. 13. Refer to the Dimensions for Transportation table and drawing for overall machine height and width measurements. Make sure to position the excavator as shown. If not transported in this position, the height measurements may be different. 1 1 HAOC090L Figure 8 LIFTING WITH SLING WARNING! Improper lifting can allow load to shift and cause injury or damage.

1. Refer to “Specification” on page 7-1 of this manual for information on weight and dimensions. 2. Use properly rated cables and slings for lifting. 3. Position machine for a level lift. 4. Lifting cables should have a long enough length to prevent contact with the machine. Spreader bars may be required. Figure 9 NOTE: If spreader bars are used, be sure that cables are properly secured to them and that the angle of the cables is factored into the lift strength. 5-4 Transportation 022-00058E Operation and Maintenance Manual 2