. OPERATION OPERATION LEVELING GROUND TO LEFT move the circle 3 - 131 1. Operate the drawb ar sid approximatel y 200 mm (7.9 i n) to the right 2. Set t he b lade right the earth is discharged outside th 3. Operate the b lade lift c ylinder so that the blade is at the desired digging d epth , then se 4. Lean the fron t wheels to the right. 5. Carr y ou t the operation in the same way as when leveling to the right.