. OPERATION OPERATION OPERATION OPERATION to prevent the tire from rubbing 3 - 133 5. eft against th e side f ace of th 6. Operate t he right blad e lift cylinder and se t the right en d of the blade to a digging depth of 50 to 100 mm (2.0 to 3.9 in). 7. Operate t he right blad e lift cylinder while tr aveling to set the right edge of the blade to the d esired digging depth. 8. Align the f ront right w heel with the bottom of the ditch and dig a d itch of the desired dept First, di g to depth of 50 mm (2.0 in) to d etermine the line of the ditc The ch so align the front an d rear wheels with th e bottom of th e ditch when c arrying out such