. OPERATION OPERATION RIPPER OPERATIONS - WITH FRAME STRAIGHT CAUTION (1.2 to 2.5 On slopes, carry out ripping downhill to use the machine. NOTICE To prevent the ground the machine. paved surface, raise the ripper after digging 3 - 153 When u sing the r ipper , set the frame strai For heavy-duty conditions, use 1 to 3 shanks. For gener al soi l condition, use 3 to 5 Keep t he ri pper at a depth w here there is no tire slip and where the engine horsepowe r can be used to it s full. Travel line approxima 4 km/h MPH), and graduall y insert the points into the ground.
weight of the damage, r aise the ripper from before turning Carry out cross ripping onl y when the re is a special When breaking up the ground t he s urface.