. ATTACHMENTS, OPTIONS HANDLING BLADE ACCUMULATOR METHOD OF OPERATING BLADE ACCUMULATOR 1. Lower the blade to the ground and stop the engine. 2. Turn the starting switch to ON position (electricity flows in the electrical circuit), then turn the accumulator switch ON. 3. Maintain the condition in Step 2, operate the left and right blade lift levers to the front and rear, and bleed the remaining pressure inside the accumulator and hydraulic circuit. 4. Turn the accumulator switch OFF, then start the engine. 5. Maintain the condition in Step 4, and extend the left and right blade lift cylinders approximately 50 mm (2.0 in).
(When doing this, retaining pressure is generated at the bottom of the blade lift cylinders.) 6. Turn the accumulator switch ON and start the accumulator. The oil at the bottom end of the left and right blade lift cylinders will flow into the accumulator, the left and right blade cylinders will retract, and the front wheels will come into contact with the ground. REMARK 6 - 3 In the condition Step 6, the pre ssure is maintained at the bottom end of t he blade lift cylin der so the blade p ushes at a certain pressure.
If operations are carried out in t he condition in Step 6, the blade will be a ble to follow a ris e or fall of approximately 50 mm (2.0 in) in the ground s urface, so uniform accumulator operatio ns can be carrie In actual fact, by operating the blade lift cylinder lever in a suitable wa y, work is carrie d out within a cert ain up- down follow-up range with a s Once the accumulator is set, there is no need to operate the blade lift cylinder when s tarting operations. If the operation is stopped and the s witch is turned OFF, raise the blade and put the blade in contact with the g round again, then turn the switch ON to make it possible to set the accumula tor to the same