Komatsu — LOADING, UNLOADING WORK

. OPERATION TRANSPORTATION 3 - 119 UNLOADING WORK 1. Load and unloa d on firm level ground o nly. Maintain a safe distance from the edge of 2. Properly apply the brakes on the trailer and put blocks the tires to ens ure that the trailer does n ot move Make the slope of the ramps a maximu m of 15 °. 3. Remove the ch ains and wire r opes fast ening the machine. 4. Start the engin e. ther, carry out an engine warming-up run, referring to the section, "STARTING IN COLD AGE 3-88)", in this manual. ke lever to the FREE position. ssion in the 1st gear and run the engine at low irection toward the ramps and drive slowly.

gravity of the machine shifts suddenly at the n the ramps and trailer, and the machine is d becomes dangerous. Accordingly, pass the ramps slowly and carefully until the machine ps perfectly. In a cold wea WEATHER (P AGE 3-88)", in this manu 5. Set parking bra ke lever to the FREE po 6. Set the transmi idle. 7. Set the travel d 8. The center of gravity of the machine shifts suddenly at the border betwee nd trailer , and th e m achine is unbalanced an Accordingly, the border slowly. 9. Drive down the leaves the ram