. MAINTENANCE SERVICE PROCEDURE CHANGE OIL IN POWER TRAIN CASE, CLEAN STRAINERS (POWER TRAIN STRAINER, SCAVENGING PUMP STRAINER) WARNING After draining the oil, tighten drain plug (P). undercover from two bolts (2) from the front side of body. of the machine body. 4 - 56 EVERY 1000 HOURS SERVI Maintenance f or every 50 , 250 and 500 hours should be carried ou The oil is at h igh temperature immed iately after t he machine has bee n operated. Wait for the oil to co ol down before starting the operation The undercov er is heavy. Never try t o open or clo se the c ove r when d irectly beneath it.
When removin g bolts(3), carry out the work from the rear of the cover so th at you can e asily ge t out of t he w ay. Refill capaci ty: 48 liters (12.68 U S gal) 1. Remove c over (1) at t he bottom rear of the machine. 2. Loosen dr ain plug (P) (with slit) and drain t he oil. 3. body as fo 1) Remov om of the machin the machin 2) Holdin g the cover , remove two bolts (3 ) from the rea r sid 3) Lower and open t he cover