Komatsu — AFTER STARTING ENGINE

. OPERATION MACHINE OPERATIONS AND CONTROLS (B) 3 - 108 17. Befo re starting oper ations, repeat the fol lowing operations slowly 3 to 5 times to circul ate warm oil through the cont Boom operation R AISE (E) ←→ LOW Arm operation IN (B) ←→ OUT (A) Buck et operation CURL (D) ←→ DUM When ca rrying out swin g operations, release swing lock switch (2), check th the swing. Swin g operation Left (G) ←→ Trave l (Lo) o peration FORWARD (A) ← → REVERSE 18.

Che gree If the hydraulic oil te mperatur e monitor i s not displaying green (it is displaying whit e), repeat Steps 6 to 10 until the displa y is gree If t he hy draulic oil temp erature monitor displ ays green, the hydraulic equipment warm-up operation is completed. After co nfirmin g that the hydraulic oil tempe rature monitor displays green, carry out the fo llowing procedure.