Komatsu — WHEN REQUIRED

. MAINTENANCE MAINTENANCE PROCEDURE CHECK AND ADJUST TRACK TENSION WARNING equipment, see "BEFORE (PAGE 3-101)", and of 4 - 27 Fo ork "STARTING ENG INE (PAG AFTER ST ARTING E NGINE OPERATIONS (P AGE 3-118 )" in the O PERATION ENGI 3-79)", WORK EQUIPMENT CONTROL The wea r of the p ins and bushings on the un dercarriage wil h the worki ng condition s and type of s oil, so inspect t he track tension fr equently in order to maintai n the standard tension. Stop the machine on firm, horizont al ground w hen carrying out the in spection an Checkin 1. Run the engin e at low i dle, then move the machine forward a distance eq ual to the track len gth on gro und, and slowl he machine. 2.

Plac e woode n bar (3) o n top of t he track fr om No. 2 roller (1) No. 3 roller (2 3. Measure the maximum he wooden b ar and to p surfac e of the tra ck shoe. Deflection "a" should b e 10 - 30 mm (0.4 - 1.2 in).