BAIC — Technical Education and Skills Development Act of 1994

TR-Automotive Servicing (Electrical Repair) NC II Revision 01 Promulgated (08/11/2020) 111 VARIABLE RANGE 3.23 Bulbs – (12 volts) - Double contact - Single contact - Headlight bulb - Peanut bulb 3.24 Fuses - 7.5 amph - 10 amph - 15 amph - 20 amph - 30 amph 3.25 Relays (30-60 Amp) 12 volts 3.26 Switches - Toggle switch (6 terminal) - Push pull switch - Push button switch 3.27 Electrical tape 3.28 Eye terminal 3.29 Female terminal 3.30 Male Terminal 4. Diagnostic tests Diagnostic tests may include: 4.1 Checking of voltage and power supply 4.2 Continuity checking of bulb, relays, wiring, grounds 5. Repair option Repair option may include:

5.1 Soldering of wires 5.2 Replace fuse, relays, switches and bulbs 5.3 Replace assembly components 6. Post-repair testing Post-repair testing may include: 6.1 Check and secure wiring connections 6.2 Secure fuses, relay, switches and connectors 6.3 Check operation such as power window, power door lock, windshield wiper, radio, sun roof, instrument panel and gauges and lighting system 7. Workplace documents May include: 7.1 Repair order 7.2 Inspection form