BAIC — Technical Education and Skills Development Act of 1994

TR-Automotive Servicing (Electrical Repair) NC II Revision 01 Promulgated (08/11/2020) 38 ELEMENT PERFORMANCE REQUIRED KNOWLEDGE REQUIRED SKILLS CRITERIA Italicized terms are elaborated in the Range of Variables 2.3 Cost-conscious habits in resource utilization are communicated based on industry standards.  Safety- consciousness  Resourceful- ness 3. Implement cost- effective operations 3.1 Preservation and optimization of workplace resources is implemented in accordance with enterprise policy. 3.2 Judicious use of workplace tools, equipment and materials are observed according to manual and work requirements.

3.3 Constructive contributions to office operations are made according to enterprise requirements. 3.4 Ability to work within one’s allotted time and finances is sustained. 3.1 Optimization of workplace resources 3.2 5S procedures and concepts 3.3 Criteria for cost- effectiveness 3.4 Workplace productivity 3.5 Impact of entrepreneurial mindset to workplace productivity 3.6 Ways in fostering entrepreneurial attitudes:

 Quality- consciousness  Safety- consciousness 3.1 Implementing preservation and optimizing workplace resources 3.2 Observing judicious use of workplace tools, equipment and materials 3.3 Making constructive contributions to office operations 3.4 Sustaining ability to work within allotted time and finances