. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS 3 - 132 3. starting check that preheating m onitor (4) li ghts up. After appro x. 30 seconds, preheati ng monitor (4) will fl ash for 10 seconds to inform th e operator th at the preheating ha s been completed. 4. When engi ne pre-heating monitor ( 4) goes off , turn the key in statin g swit ch (3) to t he START posi tion (C) to start the engine. 5. When the e ngine starts , release the key in starting swi tch (3). The k ey wil l automatically return to ON positio 6.
Keep the en gine idle for the initial 15 seconds r ight after it has been started, and do not operate any control l eve or the fuel a djustment d ial during th at time.