THE 3-POINT HITCH SETUP 3-POINT HITCH AND DRAWBAR 4. Connect the top link to the implement. If necessary, adjust the top link length. 1. Adjusting drawbar length 1. When towing an implement, it is recommended that hole (A) in drawbar be utilized. 2. For information about the drawbar load, read the implement limitations section of this manual. (See IMPLEMENT LIMITATIONS on page 27.) (1) Drawbar (1) Top link (2) Lower link (3) Latch (4) Release lever (A) “LOCK” position (B) “UNLOCK” position 9.4 Detaching implement from tractor 1. Fully lower the implement to the ground. Support the implement with parking stand (if equipped).
If necessary, adjust the top link and or lifting rod length so that the implement may stabilize on the ground. 2. Detach the top link from implement. Hook the top link in the top link support. 3. Pull the release levers on both lower links to release the quick hitches from implement ball-joints. The latches will disengage and allow the lower links to lower and detaching the implement. (1) Drawbar (2) Pivot pin (A) Hole (B) Hole DRAWBAR WARNING To avoid personal injury or death: Never pull from the top link, the rear axle or any point above the drawbar. Doing so could cause the tractor to tip over rearward. M5091,M5111 83