hyundai — Hyundai R210-9 Electrical System Manual

3. CHARGING CIRCUIT 3. CHARGING CIRCUIT When the starter is activated and the engine is started, the operator releases the key switch to the ON position. Charging current generated by operating alternator flows into the battery through the battery relay [CR-1]. The current also flows from alternator to each electrical component and controller through the fuse box.

1) 1) OPERATING FLOW OPERATING FLOW (1) (1) Warning flow Warning flow Alternator "I" terminal I/conn [CN-3 (10)] MCU alternator level [CN-52 (27)] Cluster charging warning lamp(Via serial interface) (2) (2) Charging flow Charging flow Alternator "B + " terminal Battery relay(M8) Battery(+) terminal Fusible link [CN-60] Master switch [CS-74A] Fuse box 2) 2) CHECK POINT CHECK POINT GND : Ground 4-10 Engine Start switch Check point Voltage RUN ON ① - GND (battery voltage) ② - GND (battery relay) + ③ - GND (alternator B terminal) ④ - GND (alternator I terminal) ⑤ - GND (MCU) 20~25V