. OPERATION OPERATION OPERATION OPERATION 3. stockpile, keep the cutting edge of loading blasted rock, have the 4. At the same time as thrusting the bucket into the material, raise the lift arm to prevent the bucket from going in too far. By raising the lift arm, ample traction will be produced by the front tires. REMARK 3 - 116 Whe the bucket horizontal; wh buck et tilting slightly down Be c areful not to get blast ed rock under the bucket. T his will mak e the front tires come off the ground and slip.
Try t one o keep the load in the side of the bucket, the If the bu machine cket is thrust too muc stops moving forwar h and the lift arm stops risin d, release the accelerator g or the pedal a little. Pr oper operation of the a ccelerator pedal for each typ e of the soil is eff ective for saving of fue l and prevention of wear of t he tires. 5. Che ck that there is enoug h material loaded into the bucket, then operate the bucket co ntrol lever to tilt the bucket a nd load the b ucket fully. REMARK cket edge is moved up and down while pushing in the If the bu bucket a nd digging, the front tir es will come off the ground and this 6.
If the re is too much materia l loaded in the bucket, dump and tilt the bucket quickly to re prevents spillage of the lo move the excessive load. This ad during hauling.