. OPERATION OPERATION PROCEDURE FOR OPERATIONS USING V-SHAPE LOADING OF DUMP TRUCKS drive and 3 - 127 PREPARATIONS FOR LOADING, GATHERING ROC Always keep the job area level and remove a ny rocks o NOTICE When gathering rocks, if t he operation i s carried out over a n area longer than the length of the machine, there is dange r that the m achin e will ride up o n boulders an d suffer c uts to the tires. When gathering rocks, always carry out the operation in an area shorte r than the leng th of the machine. When carrying out operat ions with the b ucket in contact w ith the ground, do not articula te the machine. This will caus e tire slippage an d damage to t 1.
Put forward, and gather t loading a nd after split 2. Afte r collecting the ro cks in an area the len gth of the change the direction ocks increase the area of l evel ground.