. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 3 - 153 5. wire spread an oth ting equipment to match the weight of th e machine, and fit the wire ropes t o the lifting hooks at t he front of the front frame and the rear of the r ear fram e (lifting hook m arks). 6. When the machine comes of f the groun cm(3.9 to 7 .9 i n)) , s top the lifting o peration , c heck carefully that the machine i s balance d a nd th at the wire ropes are loose, t hen continue the lifting operation slowly