. OPERATION MACHINE OPERATIONS AND CONTROLS Inversion NOTICE REMARK light NOTICE 3 - 169 The rock bucket (PC 400: if equipped, PC 450: st andard ) interferes wit h the arm , so it cannot be rever sed to carry out excavation t o the f ront Place the bucket in contact with a flat surfac Wh contact with the groun If th e bucket is lowere d strongly to the ground, t he resistance be i ncreased and it wil l be difficult to remove the pins. Afte r removing the pins, m ake sure that mud or sand d oes not get on t hem.
Dus t seals are fitted at bot h ends of the bushing s, be ca reful n ot to damage the Remove the doubl e nut on the stopper bolt f or arm pin (A) and link pin (B), remove the bolt, pull out ar m pin ( A) and link pin (B), and then remove t After removing the bucket, reverse it. Align arm (5) with r eplacement bucket hole ( 1), then a lign link (6) with hole (2), co at pins (A) and (B) with g rease , an d install.