. OPERATION TROUBLES AND ACTIONS LIGHTWEIGHT TOWING HOLE WARNING objects. 3 - 198 The sh ackle must always be u sed. Hold th e wire rope level a nd d irect it straig ht to the track Move t he machine slowly and be c areful n ot to app ly any sudden load to the wir There is a hole in th e track frame t o fit the shackle when towing light Permissi ble towing load: Max . 154,000N(16,00 SEVERE JOB CONDITION When carrying o ut digging operations in wate r, if th e work equipment mo unting pin goe s into t he water, carry out greasi ng every t ime th e operation is c arried o ut.
For he avy-duty operations and deep d igging, carry out greasing of the w ork equipment mounting pins e very time before operation . perate the boom, arm and bucket several times, then grease again. After g reasing, o perat e the boom, arm and b ucket several times, then g