BODY (UPPERSTRUCTURE) / Pump Device Assembly of Priority Valve 5. Install orifice (3) [blue-white] and orifice (7) [red] to spool (1). CAUTION: The components of the priority valve are easily contaminated by dirt. Prevent any foreign material from entering the components when disassembling and assembling. 1. Install plug (9) to casing (16). : 3 N m (0.3 kgf m, 2.2 lbf·ft) 6. Insert spool (1) and spring (5) into casing (16). At this time, check the direction of spool (1). 7. Install orifice (3) to plug (4). : 3 mm : 6 mm : 15 N m (1.5 kgf m, 11 lbf·ft) 2. Install seat (10) to casing (16). : 3 mm : 3 N m (0.3 kgf m, 2.2 lbf·ft) 8. Install O-ring (6) to plug (4).
Install plug (4) to casing (16). : 15 N m (1.5 kgf m, 11 lbf·ft) 3. Install spring (12) and poppet (8) to screw (13). Install poppet (8) to casing (16) so that the end of poppet (8) can be installed into the hole on seat (10). 4. Install nut (11) and gasket (15) to screw (13). : 7 mm : 50 mm : 550 N m (56 kgf m, 400 lbf·ft) 9. Install plug (2) to casing (16). : 41 mm : 450 N m (46 kgf m, 330 lbf·ft) : 22 mm NOTE: Measure, adjust the steering relief pressure, and install nut cap (14). 10. Install nut cap (14) and gasket (15) to screw (13). : 46 N m (4.7 kgf m, 34 lbf·ft) : 22 mm : 37 N m (3.7 kgf m, 27.5 lbf·ft) W2-6-27