Hitachi Construction Machinery — Removal and Installation of Control Valve (ZW250)

BODY (UPPERSTRUCTURE) / Control Valve Removal (ZW250) 4. Remove bolts (2) (4 used for each) and split flanges (1, 8) (2 used for each). Disconnect hoses (4, 7) from control valve (21). CAUTION: Bleed air from the hydraulic oil tank before doing any work. (Refer to BLEED AIR FROM HYDRAULIC OIL TANK on W1-4-1.) : 14 mm 5. Remove bolts (23) (4 used) and split flanges (22) (2 used). Disconnect hose (24) from control valve (21). CAUTION: Attach an identification tag onto the disconnected hose and the pipe for assembling. 1. Remove sems bolts (43) (4 used) from cover (44). Remove cover (44) from front frame (45). : 22 mm 6. Remove bolts (27) (4 used) and split flanges (28) (2 used).

Disconnect hose (29) from control valve (21). : 14 mm 45 44 : 17 mm 7. Remove bolts (31) (4 used) and split flanges (32) (2 used). Disconnect hose (30) from control valve (21). 43 : 27 mm 8. Disconnect hoses (34, 35, 36, 37, 38, 39, and 40) from control valve (21). Cap the open ends. : 19 mm, 22 mm CAUTION: Control valve (21) weight: 65 kg (145 lb) 9. Remove bolts (41) (3 used) and washers (42) (3 used) from control valve (21). W4GB-02-05-022 2. Remove sems bolts (14, 19) and clamps (13, 20) from pipes (12, 18). : 10 mm 10. Hoist and remove control valve (21) from front frame (45). : 17 mm 3. Remove sems bolts (11, 17) (4 used for each) and split flanges (10, 16) (2 used for each).

Disconnect pipes (12, 18) from control valve (21). : 14 mm W2-7-7