Hitachi Construction Machinery — Assembly of Control Valve (ZW220)

BODY (UPPERSTRUCTURE) / Control Valve 12. Secure spool (36) in a vise by using wooden pieces as illustrated. Install spring seat (20), spring (27) and spring seat (20) through bolt (26) in this order. Install the bolt (26) assembly to spool (36). 16. Install O-rings (12) (2 used) onto pilot housings (38) (2 used). Install pilot housings (38) (2 used) to housing (31) with socket bolts (11) (4 used). : 8 mm : 19 mm : 49 to 54 N m (5 to 5.4 kgf m, 36 to 40 lbf ft) 17. Install relief valves (34, 35) to housing (31). : 24.5 to 29 N m (2.5 to 3 kgf m, 18.5 to 21.5 lbf ft) : 27 mm : 235 to 264 N m (24 to 27 kgf m, 173 to 195 lbf ft) CAUTION:

As the set pressure of the relief valve setting differs, check the identification code. 18. Install relief valve (29) to housing (31). W4GB-02-05-002 13. Apply hydraulic oil onto spools (33, 36). Turn and insert spools (33, 36) into housing (31). 14. Install O-ring (12) to pilot housing (24). Install pilot housing (24) to pilot housing (28) with socket bolts (23) (2 used). : 32 mm : 83 to 88 N m (8.5 to 9 kgf m, 61 to 65 lbf ft) 19. Install poppet (15) and spring (14) into housing (31). Install O-ring (4) to plug (13). Install plug (13) into housing (31). : 36 mm : 8 mm : 275 to 300 N m (28 to 31 kgf m, 205 to 225 lbf ft) 20. Install plug (10) into housing (31). :

49 to 54 N m (5 to 5.4 kgf m, 36 to 40 lbf ft) 15. Install O-ring (12) to pilot housing (25). Install pilot housing (25) to housing (31) with socket bolts (11) (2 used). : 17 mm : 175 to 205 N m (18 to 21 kgf m, 131 to 152 lbf ft) : 8 mm : 49 to 54 N m (5 to 5.4 kgf m, 36 to 40 lbf ft) W2-7-21