Komatsu — ASSEMBLY

DISASSEMBLY AND ASSEMBLY TORQUE CONVERTER ASSEMBLY 1. Bearing Install bearing (15) to gear (13). 2. Gear Install gear (13) to pump (14). Mounting bolt: 66.2 ± 7.4 Nm (6.75 ± 0.75 kgm) 3. Stator shaft 1) Install seal ring (16) to stator shaft (11). Seal ring: Grease (G2-LI) Ъ Spread the seal ring out uniformly. 2) Push inner race end of bearing, and install pump assembly (12) to stator shaft (11). 4. Stator 1) Install ring (17). 2) Install stator (10). 3) Install snap ring (9). 5. Turbine, case assembly 1) Assemble turbine and case assembly as follows. i) Install bearing (8) to case. Ъ Press fit the ring until it contacts the case. 30-43 WA250-3L