Komatsu — INSTALLATION

DISASSEMBLY AND ASSEMBLY WORK EQUIPMENT WORK EQUIPMENT INSTALLATION ! Carry out installation in the reverse order of removal. WARNING! When aligning the position of the pin hole, use a bar. Never insert your fingers in the pin hole. Ъ Align the mounting pin holes for the bucket link, install cord ring (21), insert shims so that clearance c on the left and right is uniform, then assemble the mounting pin and lock with t h e bolt . Ъ Be careful not to get the cord ring caught. Ъ Clearance c : Max.

1.5 mm Ъ Operate the control levers, align the mounting pin holes for the bucket, install cord ring (21), insert shims so that clearance b on the left and right is uniform, then assemble the mounting pin and lock with the bolt. Ъ Be careful not to get the cord ring caught. Ъ Clearance b : Max. 1.5 mm Ъ To install the bucket cylinder, start the engine and align the cylinder rod with the bellcrank mounting hole. Ъ To install the boom cylinder, start the engine and align the cylinder rod with the boom mounting hole.

Ъ Raise the boom, bellcrank, and bucket link, set in the mounting position, insert shims so that clearance a between the front frame and boom mount hole on the left and right is uniform, then assemble the mounting pin and lock with the bolt. Ъ Clearance a : Max. 1.5 mm Ъ After assembling the pin, set a stand under the tip of the boom. WARNING! When starting the engine, check first that the directional lever is at neutral and that the parking brake is applied. 30-193 WA250-3L