Komatsu — TORQUE CONVERTER CHARGING PUMP

MAINTENANCE STANDARD TORQUE CONVERTER CHARGING PUMP TORQUE CONVERTER CHARGING PUMP SAL (2) 32 + SAL (2) 25 unit: mm 40-4 No. Check item Criteria Remedy 1 Side clearance Standard clearance Clearance limit Replace 0.01 - 0.15 0.19 2 Clearance between inside diameter of plain bearing and outside diameter of gear shaft 0.060 -0.125 0.200 3 Depth for knocking in pin Standard size Tolerance 12 0 -0.5 4 Rotating torque of spline shaft 4.9 -14.7 Nm (0.5 - 1.5 kgm) - Discharge amount oil: EO10-CD oil temperature:

45-55E C Rotating speed Delivery pressure Standard delivery amount Delivery amount limit - Sal(2)32 3000 rpm 2.1-2.6 MPa (21-27 kg/cm²) 88 R/min 82 R/min Sal(2)25 3000 rpm Max 2.5 MPa Max 25 kg/cm²) 72 R/min 66 R/min