MAINTENANCE STANDARD WORK EQUIPMENT LINKAGE Unit: mm 40-45 No.
Check item Criteria Remedy 1 Clearance between pin and bushing at both ends of bucket link Standard size Tolerance Standard clearanc e Clearance limit Replace (Replace also if there is scuffing of pin) Shaft Hole 65 -0.030 -0.076 +0.174 +0.100 0.130 - 0.250 1.0 2 Clearance between pin and bushing at connection of boom and bucket 65 -0.030 -0.076 +0.174 +0.100 0.130 - 0.250 1.0 3 Clearance between pin and bushing at connection of boom and frame 75 -0.030 -0.076 +0.174 +0.100 0.130 - 0.250 1.0 4 Clearance between pin and bushing at connection of frame and bucket cylinder bottom 70 -0.030 -0.076 +0.290 +0.120 0.156 - 0.366 1.0 5 Clearance between pin and bushing at connection of lever and bucket cylinder rod 70 -0.030 -0.076 +0.290 +0.120 0.156 - 0.366 1.0 6 Clearance between pin and bushing at connection of lift arm and bellcrank 70 -0.030 -0.076 +0.174 +0.100 0.130 - 0.250 1.0 7 Clearance between pin and bushing at connection of frame and boom cylinder bottom 70 -0.030 -0.076 +0.290 +0.100 0.130 - 0.366 1.0 8 Clearance between pin and bushing at connection of boom and boom cylinder rod 65 -0.030 -0.076 +0.174 +0.100 0.130 - 0.250 1.0 9 Connection bucket cylinder bottom and frame Width of boss Width of hinge Standard clearance (clearance a + b) Replace (Insert shims at both sides so that clearance is less than 1.5 mm on both left and right) 75 78 ± 1.5 0.7 - 4.5 10 Connection of boom and frame 85 ± 1.8 88 +1.5 0 1.2 - 6.3 11 Connection of boom and bucket 85 ± 1.8 88 +3 0 1.2 - 7.8 12 Connection of bucket link and bucket 85 +2.8 -0.8 88 +3 0 0.2 - 6.8 13 Connection of boom cylinder and frame 75 +0.8 -0.8 77.5 ± 1.5 0.2 - 4.0 14 Connection of boom and boom cylinder 85 +1.8 89 ± 0.8 1.4 - 6.6 15 Connection of bellcrank and boom 201 ± 0.5 204 ± 1.5 1 - 5 Replace 16 Connection of bucket cylinder and bellcrank 75 +0.8 -0.8 77.5 ± 1.5 0.2 - 4.0 17 Connection of bellcrank and bucket link 85 +2.8 -0.8 89.5 ± 1.5 0.2 - 6.8