. OPERATION OPERATION EXAMPLE FOR DESIRABLE OPERATION feeding amount, watching the condition on the grizzly feeder. separates 3 - 85 STEP The o ptimu eeding quantity tim is 0.7 to m3 (0.9 to 1.18 c u.yd). Keep 50% of the hopper capacity (measured on the trough ) a s a feeding t arge t. H owever do n ot f orget to adjust the STEP Feedi he optimum amount assures that soils a nd sand from concrete debris completely Note: Do not feed the next lot of debris immediately. STEP When the remaining debris decreased almost t o the half, feed the next lo Repea t the s ame practice thereafter