eng — SCOPE OF WORKS USING MOBILE CRUSHER

. OPERATION OPERATION 3 - 87 KEEPING SOME HEIGHT UNDER CRUSHER When crushing reinforced concrete d ebris, it is a dvisable to increase the clearance betw een the crusher und erside and the belt co nveyor top to ensure good d ischarge of th e debris If many long rei nforcing bars are contained in the reinforce d concrete debris to be crushe d, adjust the posture of the primary belt co nveyor in the followin g manner p rior to the start of NOTICE A reinforced con crete debris block larger than 1 3 mm (0.5 in) in diameter and longer than 600 mm (23.6 in) must not be c rushed, since it may dam age the crusher. 1. Start the en 2.

Depress be lt conveyor raising a nd lowering control s witch (1) he belt conveyor bar o ff the mounting hook for work 3. Stop the en 4. Detach the mounting hooks (A) fo r work that are install ed at the f the belt conveyor st opper , and install th em again mm (4.5 in) lowe M16 x 4 bolts/piece) hook weight: 3.2 kg (7 .06 lb )/piece) 5. Release th e belt conveyor stopp er and pus h in the m ounting hooks for work under the belt conveyor ba 6. Start the en gine again.