. OPERATION OPERATION PROHIBITION OF WORK ON SLOPE NOTICE Before starting a crushing work, check that the machine is level both in the fore and aft direction and the right and left direction, using a level fitted to the side of the control box. Moreover make sure that the machine undercarriage is in firm contact undercarriage (under the of the conveyor may be 3 - 93 with the If a rock primary damage Level th ground at the four sticks out at the belt conveyor), th d, when the belt co e ground before pa outermost track ro midpoint of the u e frame and belt nveyor is set to a rking the machine A crushin g work on a slop will result in the f ollowing p roblems.
Since the debris are huddled on one side of chamb The de er, partial wear d bris crushed in th evelops on the j e crusher chamb the cen the con The m ter of the primary veyor to make a achine may start