Peterbilt Medium Duty — Maintenance Schedule

PREVENTIVE MAINTENANCE SCHEDULE 5 5-20 Y53-6060-1C1 (03/17) PREVENTIVE MAINTENANCE (PM) INTERVALS SYSTEM COMPONENT MAINTENANCE TASK Recommended PM Interval I A B C Rear Suspension U-bolts Check the torque. Tighten to specified torque value as required (shown on page 5-135). X Frame & crossmember bolts Check the torque. Tighten to specified torque value as required (shown on page 5-112). X Mounting brackets and fasteners Check the condition and the fastener torque. Tighten to the specified torque value as required (shown on page 5-112). X