Komatsu — 1000 Hour Inspection

OM4214 Automatic Lubrication System - Section 42 Page 42-9 PREVENTIVE MAINTENANCE PROCEDURES Use the following maintenance procedures to ensure proper system operation. 4. Inspect all bearing points for a bead of lubricant around the bearing seal. Daily Lubrication System Inspection NOTE: It is good practice to manually lube each bearing point at the grease fitting provided on each Injector. This will indicate whether there are any frozen or plugged bearings, and it will help flush the bearings of contaminants. 1. Check the grease reservoir level after each shift of operation. Grease usage should be consistent from day-to-day operations.

Lack of lubricant usage would indicate an inoperative system. Excessive usage would indicate a broken supply line. 5. System Checkout a. Remove all SL-1 injector cover caps to allow visual inspection of the injector cycle indicator pins during system operation. 2. Check the filter bypass indicator when filling the reservoir. Replace the element if bypassing. 3. Check all grease hoses from the SL-1 Injectors to the lubrication points. b. Start the engine. c. Actuate override switch (6, Figure 42-1). The hydraulic motor and grease pump should operate. a. Repair or replace all damaged feed line hoses. b.

Ensure that all air is purged and all new feed line hoses are filled with grease before returning the truck to service. d. With the grease under pressure, check each SL-1 injector assembly. The cycle indicator pin should be retracted inside the injector body. 4. Inspect the key lubrication points for a bead of lubricant around the seal. If a lubrication point appears dry, troubleshoot and repair the problem. e. When the system is at 16 203 - 17 237 kPa (2,350 - 2,500 psi), the pump should shut off and the pressure in the system should drop to zero, venting back to the grease reservoir. 250 Hour Inspection f. While the system is venting, check the SL-1 injector indicator pins.

All of the pins should be visible. Replace or repair any defective injectors. 1. Check all grease hoses from the SL-1 Injectors to the lubrication points (see Figure 42-2). a. Repair or replace all worn or broken hoses. b. Ensure that all air is purged and all new feed line hoses are filled with grease before returning the truck to service. g. Install all injector cover caps. h. Check the lubrication timer operation. 2. Check all grease supply line hoses from the pump to the SL-1 injectors. NOTE: With the engine on, the lube system should activate within five minutes. The system should build to 13 790 kPa (2,000 psi) at the rear axle during normal pump cycle. a.

Repair or replace all worn or broken supply lines. If the system is working properly, the machine is ready for operation. b. Ensure that all air is purged and all new supply line hoses are filled with grease before returning the truck to service. If the system is malfunctioning, refer to the troubleshooting chart. 3. Check the grease reservoir level. 1000 Hour Inspection a. Fill the reservoir if the grease level is low. Check the filter bypass indicator when filling the reservoir. Replace the element if bypassing. 1. Check the pump housing oil level. Refill with SAE 10W-30 motor oil to bottom of the oil level plug if necessary. b. Check the reservoir for contaminants.

Clean the reservoir, if required. c. Ensure that all filler plugs, covers and breather vents on the reservoir are intact and free of contaminants.