MAINTENANCE 4.12 EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH High-Strength Bolt Connections (continued) Roof-mounted crane for grease barrel replacement (special equipment) Check condition and fastening of the crane Legend for illustration Z 23054 1 Crane post 2 Outrigger 7 Ropes for securing the outrigger (2) in home position 8 Ring for fastening the wire ropes (7). 9 Storage box for hoist chain 10 Crane mounting bolts, M27 quality grade 8.8. Tightening torque 920 Nm. Be sure to check security and tightening torque of the crane mounting bolts (10) after the first 100 operating hours and there- after every 1000 operating hours. Check condition of fastening ropes (7) and ring (8). 413