Komatsu — 4.16.4 AFTER FINISHING THE WELD REPAIRS ON THE SUPERSTRUCTURE

MAINTENANCE 4.16 WELD REPAIRS Electrical Units in Cab Base, illustration Z26322 1. Switch off all circuit breakers on switch board -X2-. 2. Disconnect all plugs on the programmable logic controller (4). 3. Remove the wiring harness connector from electronic pump control module (5). 4. Switch off all circuit breakers on the switch board for preheat- ing systems (if so equipped). REMARK Be sure to isolate Electronic Components of Special Equip- ment. Engine Electronics Disconnect the Deutsch connectors illustration Z22516 at the interface box on the LH engine side near.the flywheel housing. For more information refer to the Engine Operation and Mainte- nance Manual filed in Volume 2 Binder.

(1) - Engine harness (2) - Shovel harness 4.16.4 AFTER FINISHING THE WELD REPAIRS ON THE SUPERSTRUCTURE After finishing the weld repairs connect all cable connectors which have been disconnected. When connecting the Deutsch connec- tors at the interface box, make sure you hear a click. When all electrical connections are established insert the battery main switch keys. 481