Komatsu — WHEN REQUIRED

. MAINTENANCE MAINTENANCE PROCEDURE CHECK AND ADJUST TRACK TENSION WARNING equipment, see "BEFORE (PAGE 3-91)", and 4 - 26 Fo ork "STARTING ENG INE (PAG E 3-87)", "AFTER ST ARTING ENGINE OPERATIONS (P AGE 3-107 )" in the O PERATION ENGI 3-69)", ORK EQUIPMENT CONTROLS The wea r of the p ins and bushings on the un dercarriage wil l vary with ng condition s and type of s oil, so inspect t he track tension fr equently in order to maintai n the s tandard t ension. Stop the machine on firm, horizont al ground w hen carrying o ut the ins pection an Checkin 1. Run the engin e at low i dle, then move the machine forward a distance eq ual to the track len gth on gro und, and slowly he machine. 2.

Plac e woode n bar (3) o n top of t he track fr om No. 2 roller (1) No. 3 roller (2 3. Measure the maximum he wooden b ar and to p surface of the tra ck shoe. Deflection "a" should b e 10 - 30 mm (0.4 - 1.2 in).