. LOADING SHOVEL MAINTENANCE EVERY 10 HOURS MAINTENANCE 7 - 25 LUBRICATTING 1. Set to the greasing po sture below, low er the work equ ipment to the ground, th en stop the engine 2. Using a grease pump , pump in greas e through the gre ase fittings shown by a 3.
After g reasing, wipe o ff any old greas e that was push (1) Boom cylinder foot pin (2 places) pin (2 place) aces) rod end pin (2 places) foot pin (2 places) n d - Link coupling pin (4 places) cating block (10 places) pin d pin in (Boom side) in (1 place) pin (Arm side) (2 places) (2) Arm - Bucket coupling (3) Bucket hinge pin (2 pl (4) Bottom dump cylinder rod end pin (2 p (5) Bottom dump cylinder foot pin (2 place (6) Bucket cylinder foot pi (7) Bucket cylinder rod en d - Link couplin (8) Boom centralized lubri cating block (10 Boom f oot pin linder foot pin Arm cy Boom cylinder rod end Bucket cylinder rod en Boom - Arm coupling p (9) Arm cy linder rod end p (10 ) Boom - Arm coupling pin (Arm side) (