Cummins — ENGINE STORAGE - LONG TERM

Section 14 - Engine Testing - Group 14 Engine Storage - Long Term (14-08) M11 Page 14-53 Remove the Engine From Short Term Storage Remove the tape from the openings. Remove the warning tag. Replace the oil, water and fuel filters. Prime the lubricating oil system. Use clean diesel fuel to flush the preservative oil from the fuel system. Fill the cooling system (if necessary). Adjust the injector and valve clearance. Refer to Engine Assembly (00-02). Adjust the belt tension. Refer to Engine Assembly (00-02). Engine Storage - Long Term (14-08) This procedure describes the proper method to prepare an engine for long term storage (six to 24 months).

Operate the engine at ‘‘High Idle’’ speed until the coolant temperature indicator reaches: Temperature: 70°C [160°F] Shut off the engine.