11 Fieldwork 11.5 Feeder unit 67087 82105 11.5.2 Reading the cutting height The sender (1) indicates the front attachment cutting height above the ground on gauge (A). Lower the front attachment during threshing until the pointer of gauge (A) is in the upper range at "9" (9 = about 100 mm cutting height). Raise / lower front attachment if required. 1 Note! Uneconomic use of machine and of front attachment. 2 14 High fuel consumption. 19602 High wear on the front attachment. 9 The further the pointer on gauge (B) falls towards "0“, the higher the front attach- ment ground pressure. Do not set the ground pressure unneces- sarily high. Raise / lower front attachment if required.
The further the pointer on gauge (A) falls towards "0“, the lower the front attach- ment cutting height is above the ground. Do not set the cutting height unnecessar- ily low. Raise / lower front attachment if required. A B 15 19601 73212 11.5.3 Reversing the front attachment / feeder unit In case of clogging of the front attachment / feed rake conveyor, the drive of the front attachment / feed rake conveyor can be rotated backwards via a hydrostatic motor. Prepare fieldwork. Engage the threshing mechanism. Disengage the front attachment. Caution! Machine components may run on although the drive has been shut down. Machine damage. Wait for all machine components to come to complete stop.
00 0293 210 2 - BA DOMINATOR 150/140/130 - 12/09 201