John Deere 450DLC — Main Relief and Power Digging Valve Circuit Operation

TM2361 (24JUN08) 9025-05-69 450DLC Excavator Operation and Tests 062608 PN=707 Theory of Operation 29 32 30 31 26 27 19 21 –UN–12APR06 85 28 TX1006228 TX1006228 Auto-Power Lift Operation 19—Supply Oil 28—Voltage 31—Engine 85—Main Relief and Power Dig 21—Pilot Oil 29—Boom Up Pressure Sensor 32—Hydraulic Pump 1 Delivery Valve 26—Main Controller (MCF) 30—Arm In Pressure Sensor Pressure Sensor 27—Power Dig Solenoid Valve SG Auto-Power Lift Operation—The function of the electrical signal to energize the power dig solenoid auto-power lift control circuit is to increase the main valve SG (27).

The pilot oil (21) pressure signal from hydraulic system operating pressure by temporarily the power dig solenoid valve SG (27) pushes the increasing the main relief and power dig valve (85) piston in the main relief and power dig valve down, pressure setting for boom up operation. increasing the pressure setting. The main hydraulic system can now operate at a higher operating NOTE: Auto-power lift is activated during combined pressure. boom up operations, except arm in.

Counterweight Removal Circuit Operation—The During a boom up operation, when the MCF (26) function of the counterweight removal circuit is to receives an electrical signal from the boom up increase the main hydraulic system operating pressure pressure sensor (29) and hydraulic pump 1 delivery by temporarily increasing the main relief and power dig pressure sensor (32) and zero output signal from the valve (85) pressure setting during counterweight arm in pressure sensor (30), the MCF sends an removal operation. Continued on next page LD30992,000025C –19–13APR06–4/6 9025 05 69 85