John Deere 450DLC — Arm 2 Flow Rate Circuit Operation

Theory of Operation 1—Boom Up (pilot) 99—Boom 1 Spool 111—Arm Regenerative 182—Pilot Oil 4—Arm In (pilot) 105—Arm 2 Flow Rate Control Valve—Switch Valve 184—Return Oil 15—Pump 1 Valve—Switch Valve 118—Arm 1 Spool 200—Pump 1 Supply Oil 16—Pump 2 106—Arm 2 Flow Rate Control 126—Boom 2 Spool 201—Reduced Flow Pump 1 27—Pilot Pump Valve—Poppet Valve 168—Boom Cylinders Supply Oil 66—Pilot Signal Manifold 107—Arm 2 Spool 169—Arm Cylinder 202—Pump 2 Supply Oil 71—Arm 2 Flow Rate Pilot Valve (port SK) Normal Operation— During normal operation, pump 1 supply oil (200) is routed to the boom 1 spool (99) and the arm 2 spool (107) through the 4-spool power circuit, and pump 2 supply oil (202) is routed to the arm 1 spool (118) and the boom 2 spool (126) through the 5-spool power circuit.

With the switch valve shifted, the pump 1 supply oil (200) is routed to the back side of the arm 2 flow rate control valve—poppet valve (106), where it can push on the poppet valve reducing the flow of pump 1 supply oil (201) to the arm 2 spool (107). Consequently, more pump 1 supply oil is available to the boom 1 spool (99), allowing the boom up speed to be maintained. Combined Operation— During combined operation of boom up (1) and arm in (4), arm in pilot pressure shifts the arm 2 flow rate pilot valve (71), allowing boom up pilot oil to flow to, and shift, the arm 2 flow rate control valve—switch valve (105).

For arm 2 flow rate pilot valve information, see Pilot Signal Manifold Operation. (Group 9025-05.) During this combined operation the arm function will be maintained by the pump 2 supply oil (202) and the arm 1 spool regenerative circuit. See Regenerative Valve Circuit Operation. (Group 9025-05.) Continued on next page LD30992,0000259 –19–15MAY08–2/4 9025 05 95 TM2361 (24JUN08) 9025-05-95 450DLC Excavator Operation and Tests 062608 PN=733